Class gn c 4-2-0

Class Details
Crapton 4-2-0, 10 locomotives delivered. Within 2-3 years all converted to 2-2-2 locomotives.
As Crapton 4-2-0: Weight 26 tons 13; Pressure: 120 psi; Cyls: 16x21; DW: 6 ft 6.
As rebuilt 2-2-2: Weight 28 ton 7; Pressure 130 psi; C 16x21; DW: 6 ft 6.
Pressure increased to 130 psi, weight to 30 tons 11 by Sturrock, then pressure increased to 140 psi and weight to 30 tons 15 by Stirling in subsequent rebuilds; DW increased to 6 ft 7 in the Stirling rebuild

BR #LNER #Great Northern Railway #NameBuiltWdrn1950 shedLast shedNotesPhotos
91Apr1851Mar1884
92May1851Jun1870
93May1851May1885
94Jun1851Oct1876
95Jul1851Apr1886
96Jul1851Jun1879
97Aug1851Mar1888
98Nov18511877
99Feb1852Dec1883
200Mar1852Nov1870

Number of locomotives logged in this class is 10.

Number of locomotives with photos available in this class: 0.