Class Details
Crapton 4-2-0, 10 locomotives delivered. Within 2-3 years all converted to 2-2-2 locomotives.
As Crapton 4-2-0: Weight 26 tons 13; Pressure: 120 psi; Cyls: 16x21; DW: 6 ft 6.
As rebuilt 2-2-2: Weight 28 ton 7; Pressure 130 psi; C 16x21; DW: 6 ft 6.
Pressure increased to 130 psi, weight to 30 tons 11 by Sturrock, then pressure increased to 140 psi and weight to 30 tons 15 by Stirling in subsequent rebuilds; DW increased to 6 ft 7 in the Stirling rebuild
BR # | LNER # | Great Northern Railway # | Name | Built | Wdrn | 1950 shed | Last shed | Notes | Photos |
---|---|---|---|---|---|---|---|---|---|
91 | Apr1851 | Mar1884 | |||||||
92 | May1851 | Jun1870 | |||||||
93 | May1851 | May1885 | |||||||
94 | Jun1851 | Oct1876 | |||||||
95 | Jul1851 | Apr1886 | |||||||
96 | Jul1851 | Jun1879 | |||||||
97 | Aug1851 | Mar1888 | |||||||
98 | Nov1851 | 1877 | |||||||
99 | Feb1852 | Dec1883 | |||||||
200 | Mar | 1852 | Nov1870 |
Number of locomotives logged in this class is 10.
Number of locomotives with photos available in this class: 0.